1/4
|
|
|
The ADMA-OPCO portion involves the challenging offshore portion
of gas production by drilling additional gas wells and processing platforms at Umm
Shaif for gas dehydration and transfer to Das Island through the new main gas line
to be laid under this contract.
Client: ADMA-OPCO
|
|
|
|
|
|
Construction Engineering, Fabrication, Transportation, Installation, Hook-up/Tie-ins
and Pre-Commissioning for following Facilities:
- ZULF TP7- Jaket Deck,Bridge and Subsea Spools
- ZULF TP8- Jaket Deck,Bridge and Subsea Spools
- MRJN TP6- Scraper Deck
- ZULF TP5- Scraper Deck
- ZULF TP6- Scraper Deck.
Client: Aramco Overseas Company B.V & Saudi Aramco Oil Company(Saudi
Aramco)
|
|
|
|
|
|
Site Survey,Verification of Basic Desgin,Detailed/Construction Engineering ,Procurement,
Fabrication,Transportation ,Installation,Testing and Pre-commissioning of 20 New
Water Injection Submarine Pipelines at ZK field and 4 Nos.Water Injection Pipelines
at US Field including Removal of existing Risers/Installation of New riser Clamps/Risers
at Platforms and Associated Topside Modification Works at the existing Platforms.
Client: ADMA-OPCO
|
|
|
|
|
|
Detailed Engineering ,Construction Engineering , Procurement of Line Pipes , Fabrication
, Pipe Coating , Transportation , Installation, Testing & Pre-commissioning of 30"
OD ,117 Km of Pipeline between the beach valves at Das Island and the beach valve
at Habshan Landfall (Ras Al Qila).
Client: GASCO
|
|
|
|
|
|
Design,Engineering,Procurement ,Fabrication ,Onshore Commissioning ,Load out ,Sea
Fastening Transportation to Company's designated Offshore Location,Installation
& Hook-up and Commissioning of the Facilities.
Client: Maersk Oil Qatar
|
|
|
|
|
|
2/4
|
|
|
Installation Engineering ,Welding Procedures ,Provision of Installation Aids,Slings
& Shackles and Provision of DLB-1000 Construction Spread Offshore Qatar for
a minimum Period of 145 days on day rate basis for the installation of Pipelines
and three Wallhead Platforms at Bh& MM Fields Offshore Qatar.
Client: Sime Darby Engineering Sdn.Bhd.
|
|
|
|
|
|
Ready for Drilling (RFD) for Well Platforms C-22 & C-39-1
Client: Oil & Natural Gas Corporation Ltd.Mumbai,India
|
|
|
|
|
|
Design , Engineering , Procurement ,Fabrication, Load-out, Sea fastening , Transportation
to Offshore Location , Installation there of and Hook-up of the facilities , which
include :
- BD Wellhead Platform Jacket and Risers
- BD Wellhead Access Module
- Bridge Connecting the BD Jacket to the existing BA Platform
- CD Wellhead Platform Jacket Risers
- CD Wellhead Access Module
- Bridge Connecting the DD Jacket to the existing CA Platform
- GA Wellhead Platform Jacket Risers
- IA Wellhead Platform Jacket Risers.
Client: Maersk Oil Qatar AS
|
|
|
|
|
|
Hire of Marine Barge Spread for Loading Arm Replacement ,Flare Modification Works
and LNG Jetty Strengthening Works.
Client: ADGAS
|
|
|
|
|
|
Installation of GIP, AN-7 & KK! Decks
Client: Qatar Petroleum Development Co.(Japan) Limited.
|
|
|
|
|
|
3/4
|
|
|
Comprises of Surveys (Pre-Engineering ,Pre-Installation and Post-Installation) Design
,Engineering ,Procurement ,Fabrication ,Anticorrosion(for both Rigid and Flexible)
& weight Coating (in case of Rigid Pipeline), Load-out,Tie-down/Sea-fastening,Tow-out/Sail-out,Transportion,Installation,Hook-up,Installation
of Submarine Pipelines ,Installation of Submarine Cables, modifications on existing
Platforms , Testing ,Pre-commissioning ,Commissioning(wherever applicable) of the
Facilities stated herein.
Client: Oil & Natural Gas Corporation LTd.,Mumbai,India(ONGC).
|
|
|
|
|
|
Upgrade / Modifications to Existing Facilities Upgrade of Gas Producer Well Head
Facilities, Upgrade of Existing RMSs (1 to 5), Upgrade of Trunk Line No.5, Upgrade
ofInjection Well Head Facilities.
New Gas Gathering System 20 New Production Wells, 4 New Production Trunk Lines,
New Flow Lines for New Wells, I New RMS with Launcher & Receiver Area.
New Gas Injection System 12 New Gas Injection Wells and 4 New Injection Trunk Lines.
New Trunklines & Flow lines Production / RE-injection Trunk lines & Flow
lines for 6" to 18" = total 368 KM.Demolition & Removal Redundant
Facilities.
Client: ADCO
|
|
|
|
|
|
Site Survey, Construction Engineering, Procurement of all Piping/Structural Material,
Onshore Fabrication & Testing and Offshore Installation.
Client: ADMA-OPCO
|
|
|
|
|
|
Engineering, Procurement and Construction of Three wellhead platform decks, two
export pipelines from platform to onshore facilities in Ras Laffan, two infield
subsea pipelines, four cables and other associated works.
Client: Qatar Liquefied Gas Company Limited (II)
|
|
|
|
|
|
Subsea Pipelaying of ONGC MUT Project.
Client: Hyundai Heavy Industries Co.Ltd./ ONGCL
|
|
|
|
|
|
4/4
|
|
|
Installation of Jacket, Piles, Jacket Appurtenances, Deck, Conductors, Subsea Pipeline,
PLEM and SPM System for D1 Well Cum Water Injection Platform Project.
Client: Engineering India Limited(EIL) / ONGCL
|
|
|
|
|
|
|
|