  • Anticorrosion Coating on 6" Line Pipes--Bu Hasa Facilities Development Project - 2007.

    3 Layer PP on 6 " Line Pipes-670 M.

    Client: Snamprogetti

  • Three Layer PE Coating for Line Pipe for 1694-RAK Gas HDD Diversion Project -2007.

    PE Coating on 12'' & 16 '' Pipes : 3.128 M

     

    PE Coating on 12'' & 16 '' Pipes : 3.128 M

    Client: Dutco McConnel Dowell

  • Major Overhaul of COS Tank No.12-Das Island - 2006.

    Major Overhaul of COS Tank No.12- Das Island

    Client: ADMA-OPCO

  • Supply of 2 Nos.Process Columns for Onshore Pipeline and Habshan Facilities Package of OAG Project - 2006.

    Mechanical Design,Procurement,Fabrication,Inspection,Testing,Painting and Supply Ex-works.

    Client: GASCO

  • Installation of Waste Gas Handling Unit(WGHU) at NGTP,USSC - 2006.

    Installation of Waste Gas handling Unit(WGHU) at NGTP,USSC

    Client: ADMA-OPCO

  • Supply of 11 Nos.HP/MP Pressure Vessels for Onshore Pipline and Habshan Facilities Package of OAG Project - 2006.

    Mechanical Design,Procurement,Fabrication,Inspection,Testing,Painting and Supply Ex-works

    Client: GASCO

  • OAG Project No.5234--EPC Package3--Onshore Pipeline and Habshan Facilities - 2006.

    36"x90 km Pipeline from Ra's Al Qila to Habshan.Habshan Plant Facilities.Substations,Equipment Shelters,Compressor Shelter & O/M Shelter etc.

    Client: GASCO

  • Bu Hasa-Habshan Gas Pipeline Project No.5238-EPC Works - 2006.

    36"x50 km Pipeline from Bu Hasa to Habshan, Chemical Injection Package at Bu Hasa, Scraper Receiver & Slug Catcher at Habshan , ECB at Habshan.

    Client: GASCO

  • AGD-II Pipeline Coating - 2006.

    Three Layer External Polyethylene Coating of 16" Linepipes of total length approx: 81.70 Km.

    Client: Eastern Bechtel Company Ltd / GASCO

  • Supply of 15 Nos.Incoloy 825/SS 316L Cladded Pressure Vessels - 2006.

    Mechanical Design,Procurement,Fabrication,Inspection, Testing,Painting and Supply Ex-works.

    Client: Fluor Mideast Ltd.

  • Supply of 8 Nos.Reactor Vessels - 2006.

    Mechanical Design ,Procurement (including Internals and Refractory Lining Material),Fabrication,Inspection,Testing,Painting and Supply Ex-works.

    Client: Fluor Mideast Ltd.

  • Major Overhaul of COS Tank No.20-Das Island - 2006.

    Manor Overhaul of COS Tank 20-Das Island.

    Client: ADMA-OPCO

  • Provision of Workforce & Equipment For Above Surface Maintenance Vessel NMS 209 & 208 - 2006.

    Provision of Personnel & Equipment to work on Adma-Opco provided Vessel 209.

    Client: Abu Dhabi Marine Operating Company

  • Construction Contract For New SPM Loading Facilities TB-3 Das Island - 2005.

    Replacement of existing Turn Table Type CALM Buoy and Associated PLEM and Umbilical with a new Turret-Type CALM Buoy System including PLEM Umbilical .

    Client: Abu Dhabi Marine Operating Company

  • Anti-Corrosion and Concrete Coating Works on Sealines ---Dolphin Project - 2005.

    3 Layer PP + Concrete Coating (40mm to 90mm ) on 36'' Line Pipes-50 KM.

    Client: Saipem

  • FBE Coating of 4" Pipe - 2005.

    FBE Coating of 4" Line Pipes (60,000 Ft.)

    Client: BP Pakistan Exploration and Production .

  • Supply of 1 No.New Gas Scrubber (ADMA-CTU) and 1 No.New Feed Gas K.O Drum (ADGAS-LNG Train 3 ) for Das Island HP Feed Gas Conditioning System - 2005.

    Mechanical Design , Procurement ,Fabrication , Inspection , Testing , Painting and Supply Ex-Works.

    Client: ADGAS

  • Hamriyah-SIA Link Project-PE Coating of Pipes - 2005.

    PE Coating of 8" Line Pipes

    Client: Anabeeb (JV between BP Middle East & Government of Sharjah)

  • Supply of 3 Nos.Columns & Net Gas Scrubber - 2005.

    Mechanical Design,Procurement,Fabrication,Inspection,Testing ,Painting and Supply Ex-works

    Client: CCC- Oman LLC.

  • Al Ghweifat' Repair Works - 2005.

    Leg Repairs on NDC Jack-up Barge Al Ghweifat

    Client: National Drilling Company (NDC)

  • CTE & Concrete Coating of 12.75" Line Pipes - 2005.

    CTE & Concrete Coating of 12.75" Line Pipes

    Client: Gulf Piping Compan

  • Polyethylene Coating of Line Pipes - 2005.

    External 3 layer PE and Internal Epoxy Coating (Optional) of following Line Pipes :

    48"x 26.8 mm W.T. : 9.600 m 
    36"x 21.5 mm W.T. : 350 m 
    36"x 31.8 mm W.T. : 36 m

    Client: Al Jaber Energy Services

  • Zakum-ETPP Bypass-Das Island - 2005.

    Minor Piping Construction Works

    Client: ADMA-OPCO

  • New SPM Loading Facilities (TB-6) at Das Island - 2005.

    Installation of 48" SPM Loading Line and SPM System

    Client: ADMA-OPCO

  • Zirku Gas Bypass and Segregation of 30" & 18" Systems - 2005.

    Piping Construction Works and Minor Supply of Material

    Client: ADMA-OPCO

  • Jackets Fabrication and Load-out ( 3 Nos.) for Panna, mukta and Tapti Field Development - 2005 .

    Jackets Fabrication and Load-out ( 3 Nos.)

    Client: Clough Projects International PTy Ltd.

  • TAKREER AWARDS US$57 MILLION EPC CONTRACT TO NPCC - 2005.

    Carry out the Detailed Engineering, Procurement, Construction, Commissioning and Testing of the OGD III Condensate Storage Tanks Project (Package #5) for Ruwais Refinery

    Client: TAKREER

  • PE Coating of Pipes - 2005.

    PE Coating of 12.75" Line Pipes

    Client: ALSA Technical Supplies

  • PE Coating of Pipes - 2005.

    PE Coating of 4" to 12.75" Line Pipes

    Client: Van Leeuwen Pipe and Tube

  • Engineering Works for FRAMO Multiport System Manifold at ASAB RDS-2 - 2004.

    Engineering Works for FRAMO Multiport System Manifold at ASAB RDS-2

    Client: ADCO

  • Zirku Gas Bypass and Segregation of 30" & 18" Systems - 2005.

    Perform External Coating and Internal Lining on 12" Pipe 59,400 Meters.

    Client: McConnel Dowell.

  • Major Overhaul of COS Tank No.9-Das Island - 2005.

    Normal Tank Overhaul Works

    Client: Clough Projects International PTy Ltd.

  • Engineering services for converting Asab Zone "A" (Sb-249) to Water Alternate Gas - 2004

    Engineering services for converting Asab Zone "A" (Sb-249) to Water Alternate Gas

    Client: ADCO

  • Hire Out/Sale of Shorepull Items required for NEB Offshore Pipelines and Cable Work - 2004.

    Hire Out/Sale of Shorepull Equipment and other items

    Client: CCIC